Charge N Go — EV charging, solar & storage
How charging works

AC vs DC EV charging in Singapore: speed, hardware and where each fits

AC vs DC charging explained: where the power is converted, why your car's onboard charger caps AC speed, and when a Singapore business needs DC.

Updated 10-minute readBy the Charge N Go installation team
White wall-mounted DC charger with a screen, red E-stop, status lights and card reader, beside a roller shutter.

The short answer

The difference is where AC from the grid becomes DC for the battery. With AC charging, the car's onboard charger does the conversion and caps the speed; homes and workplaces use 7.4kW to 22kW AC chargers. With DC charging, the charger converts the power itself and feeds the battery directly. Our DC range runs from 30kW to 240kW.

  • AC charging: the car's onboard charger converts the power, and it sets the speed limit.
  • DC charging: the charger converts the power and bypasses the onboard charger.
  • Homes and workplaces use AC: up to 7.4kW on single-phase supply, 11kW or 22kW on three-phase.
  • Our DC line-up runs from a 30kW wall unit (about 28 minutes per 100km) to 240kW cabinets.
  • The EHVCG grant only covers chargers of 50kW or more that serve new electric heavy vehicles.
On this page (7 sections)

What is the difference between AC and DC charging?

The grid delivers alternating current (AC). A car's battery stores direct current (DC). Somewhere between the two the power has to be converted, and the whole AC versus DC question comes down to where that happens.

With AC charging, the charger passes AC to the car, and a converter inside the car, the onboard charger, turns it into DC for the battery. With DC charging, the conversion happens inside the charger itself. The charger delivers DC straight to the battery, and the car's onboard charger is bypassed.

AC charging: the car converts the power

Grid supply

Your home or building

AC wall charger

7.4kW to 22kW

Car's onboard charger

Converts AC to DC, and caps the speed

Battery

DC charging: the charger converts the power

Grid supply

Usually a commercial supply

DC charger

Converts AC to DC inside the unit, 30kW and up

Onboard charger

Bypassed

Battery

Where the conversion happens. On AC, the car's onboard charger does it and sets the pace. On DC, the charger does it and the onboard charger is bypassed.

For a homeowner this is mostly background, because the chargers we install at homes are AC. For a business it decides three things at once: the hardware on the wall or the floor, the electrical works behind it, and whether a grant applies.

The two also use different plugs. AC chargers here have a Type 2 connector. DC chargers use CCS2, also called Combo 2: the Type 2 face with two large DC contacts added below it. Our guide to Type 2 and CCS2 connectors explains both, and what LTA requires at public chargers.

Why your car's onboard charger caps AC speed

LTA's guide for EV drivers puts it in one line: the rate of AC charging is limited by the onboard charger. However powerful the charger on the wall, the car only draws what its onboard charger can convert.

LTA lists the AC levels an EV can support: single-phase charging at up to 3.7kW or 7.4kW, or three-phase charging at up to 11kW, 22kW or 43kW. Its own worked example is a car that only supports single-phase charging. Connected to an 11kW three-phase charger, it still charges at 3.7kW.

On AC, the car draws the lower of the two ratings
AC chargerCar's onboard charger acceptsWhat the car draws
7.4kW, single-phase7.4kW7.4kW
11kW, three-phaseSingle-phase only, 3.7kW (LTA's example)3.7kW
22kW, three-phase11kW, three-phase11kW
22kW, three-phase22kW, three-phase22kW
Illustrative. The second row is LTA's own worked example. Your car's AC charging rating is in its specification sheet or handbook.

That is why sizing an AC charger is a matching exercise, not a race. Extra AC power only helps if the car accepts it; our 7kW vs 22kW guide works through that choice for a home. DC sidesteps this particular limit, because the onboard charger is not in the path at all.

AC charging: homes and workplaces

AC suits anywhere a car is parked for hours: at home overnight, or at work through the day. Low-voltage supply in Singapore comes as 230V single-phase or 400V three-phase, according to SP Group. A single-phase supply takes a charger of up to 7.4kW, and a three-phase supply takes 11kW or 22kW.

Range added per hour of charging

At 14 kWh per 100 km. AC figures assume the car's onboard charger accepts that power.

7.4kW ACsingle-phase
~53 km
11kW ACthree-phase
~79 km
22kW ACthree-phase
~157 km
30kW DCcommercial
~214 km
Range added per hour of charging, at 14kWh per 100km. The AC bars assume the car's onboard charger accepts that power.

Which size suits you depends on your supply and your car, and the free site survey checks both before anything is quoted. An AC wall charger takes 1–3 hours to install on site, and the typical turnaround to your first charge is 1–3 days. We supply ten AC brands, all LTA type-approved; see the AC wall chargers we install.

AC is not only for homes. At a workplace where staff park all day, or a condominium carpark where residents charge overnight, AC can be all you need: the cars have the time, and the installation is simpler than DC.

NEG wall charger under a small canopy on a red brick gate pillar, an isolator beside it and the cable coiled below.
AC charging: a wall unit on a gate pillar, with its isolator beside it. The conversion to DC happens in the car, not in the charger.

DC charging: from a 30kW wall unit to 240kW cabinets

DC earns its place where vehicles need range back within the working day rather than overnight. Because the charger does the conversion, the onboard charger's AC limit no longer applies, although how much DC power a car accepts still depends on the car.

Our DC line-up starts with the Hici DC30, a 30kW wall-mounted unit. It adds about 100km of range in roughly 28 minutes, and installation takes about 5 hours on site, so it usually goes in the same day. See our 30kW DC chargers.

Above it are DC cabinets from 60kW to 240kW, from Sinexcel, Hici, NEG Power and Gresgying, for depots, heavy vehicles and sites where several vehicles share the chargers. Their installation time is set at the survey, because it depends on the supply works. See our 60–240kW DC fast chargers.

Every DC charger we supply has a CCS2 connector and supports OCPP, the open protocol that lets a charger talk to a management system, so a business can control who charges and bill per session or per kWh.

AC and DC at a glance
AC wall chargerDC30 wall unitDC cabinet
Power7.4kW to 22kW30kW60kW to 240kW
Where AC becomes DCIn the car's onboard chargerIn the chargerIn the charger
Capped by the onboard charger?YesNoNo
ConnectorType 2CCS2CCS2
Time on site1–3 hoursAbout 5 hoursSet at the survey
EHVCGNot eligibleNot eligible: below 50kWPossible, if the applicant and vehicle qualify
Typical settingHomes, condos, workplaces where cars park for hoursWorkplaces, dealerships, light vansDepots, heavy vehicles, busy fleet sites
Charging speed on DC also depends on what the vehicle accepts. We confirm realistic figures for your vehicles at the survey.
Free-standing NEG DC charger on a concrete plinth in a covered car park, two cables looped, small EVs parked behind.
A floor-standing DC cabinet with two outlets. On DC, the conversion happens inside the charger, not in the car.

When does a business need DC?

The deciding question is dwell time: how long each vehicle is parked, and how much range it needs back before it leaves. Count your vehicles, how long each one actually parks and when demand peaks, and the answer usually becomes clear.

AC is usually enough when…

  • Vehicles park for several hours at a stretch, overnight or through a working day.
  • Each charging point serves one or two vehicles.
  • Your site has little spare electrical capacity.

Start with AC. It is the simpler, quicker installation.

DC earns its place when…

  • Vehicles need range back between jobs, not overnight.
  • Several vehicles share one charging point and a queue forms.
  • Customers or visitors charge while they wait.

Size the DC unit to the turnaround you need.

At a commercial survey, these are the things we look at before recommending AC, DC or both:

  • How many vehicles will charge, and how long each one actually parks.
  • How far each vehicle runs in a day, and when it needs to leave again.
  • When demand peaks, and whether vehicles would queue for the same bay.
  • The incoming supply, the load the site already carries, and the switchboard's capacity.
  • Where the chargers can stand, and how the cables will run to them.

A site can have both: AC for the vehicles that sit overnight, DC for the ones that turn round during the day. If the grant below does not apply to you, a 30kW unit may still be the better buy: it installs in about 5 hours, and it asks less of your electrical supply than a high-power cabinet.

Every DC project starts with the supply, because even our smallest DC charger draws more power than the largest AC wallbox we fit. Our commercial and fleet installation page shows how we plan a site from the supply up, whether it ends in AC, DC or a mix.

Already have an AC charger the business has outgrown? Our trade-in programme puts up to $2,000 against a DC30 for a working AC charger from one of the ten AC brands we carry. It is for SME and commercial sites only.

Which DC chargers does the EHVCG grant cover?

LTA's Electric Heavy Vehicle Charger Grant (EHVCG) co-funds DC chargers, but it is narrower than it sounds: it follows the vehicle, not the site. In outline:

  • You must register a new electric heavy vehicle (over 3,500kg) between 1 January 2026 and 31 December 2028 for each co-funded charger. Restricted Use vehicles do not qualify.
  • The charger must be a smart charger rated at least 50kW, installed at a lorry or coach lot.
  • The grant co-funds 50% of eligible costs, capped at S$30,000 per charger, for up to three chargers per site, and only for the first 500 chargers approved.
  • You apply through the Business Grant Portal. You can order the vehicle and pay its deposit first, since the application asks for that purchase order or deposit receipt.
  • The charger must not be installed before LTA's Letter of Offer. It must then be installed within a year and kept working for three years.

Is DC fast charging bad for the battery?

We will not put a number on it, because the honest answer depends on the car, and we have no figures we could stand behind. What we can say is that every EV manages its own battery: the car decides how much DC power it will take, and it can draw less than the charger offers.

Manufacturers publish their own guidance on how often to use DC fast charging, and that guidance, in your handbook or from your dealer, is the one to follow. For a fleet, check each vehicle model's guidance before deciding how much of your charging should be DC.

Sources

The official pages this guide was checked against.

  1. Electric Vehicle Guide for Drivers (Land Transport Authority, 2024)
  2. How to apply for electricity connection (SP Group, January 2026)
  3. Charger grants (ECCG and EHVCG) (Land Transport Authority)
  4. Transitioning to EVs: incentives and grants (Land Transport Authority)
  5. Regulating the safety of EV chargers (Land Transport Authority)

Written by Charge N Go's installation team. We supply and install EV chargers for homes and businesses across Singapore, and we update this guide when the rules or the sources above change.

Questions people ask

Is DC charging faster than AC?

Usually, yes. A DC charger converts the power itself and bypasses the car's onboard charger, which is what limits AC speed. Our 30kW DC unit adds about 100km of range in roughly 28 minutes. How fast a particular car charges on DC still depends on what that car accepts.

Why does my car charge slower than the charger's rating?

On AC, the rate is limited by your car's onboard charger. LTA's own example is a car that only supports single-phase charging: connected to an 11kW three-phase charger, it still charges at 3.7kW. Check your car's AC charging rating before choosing a charger size.

Do I need a DC charger at home?

We install AC chargers at homes. A car parked overnight has hours to charge, and an AC charger on single-phase supply (up to 7.4kW) or three-phase supply (11kW or 22kW) works within that, up to what your car accepts. DC equipment is for businesses whose vehicles need range back within the working day.

Is a 30kW DC charger eligible for the EHVCG?

No. The EHVCG requires a charger rated at least 50kW, so a 30kW unit falls below the minimum whoever applies. The grant also depends on registering a new electric heavy vehicle between 1 January 2026 and 31 December 2028, one for each co-funded charger.

Is DC fast charging bad for my battery?

We do not publish figures on this, because it depends on the car. Each EV manages how much power it accepts, and each manufacturer publishes its own guidance on fast charging. Follow the guidance for your car.

How long does a DC charger take to install?

A 30kW DC wall unit takes about 5 hours on site, so it usually goes in the same day. For 60kW to 240kW cabinets, the time depends on the supply works and is set at the survey. An AC wall charger takes 1–3 hours on site.

Which connector does DC charging use?

CCS2, also called Combo 2: the Type 2 face with two large DC contacts below it. LTA requires publicly accessible chargers to provide Type 2 AC and/or CCS2 DC connectors. Every DC charger we supply uses CCS2.